Project 02

Standing seam roof to a garden room

A leaking felt roof replaced in double-lock standing seam aluminium, panels rolled on site to the full length of the slope so there is no horizontal lap anywhere on the run.

Location
Alresford, Hampshire
Completed
2025
A ribbed metal roof running to the ridge against a clear sky.

The problem, and the number

The slope runs long enough that stock panel lengths would have put a lap partway up it. We rolled on site instead and ran every panel ridge to eave, which removes the only joint on a metal roof that has to be sealed rather than seamed.

The panels are fixed at the ridge and float at the eave on concealed clips, so the movement goes where it was designed to go. Nothing is face-screwed through the water plane.

Scope: strip, on-site roll forming, standing seam, all leadwork

Specification

System
Double-lock standing seam, 0.7 mm aluminium
Panel
Rolled on site, full-length runs
Seam
Double-locked, concealed clip
Uplift
Calculated to BS EN 1991-1-4
Finish
PVDF, 25 micron
Completed
June 2025